3 months in

Joe and I have been busting our behinds trying to get the kitchen done. During the 3 months of working weekends only, we are almost finished. The cabinets are sanded and painted, I have tiled over the site poured cement and tiled the back splash area. We had someone come in and replace the window. We used peel and stick tiles on the floor. (I will never use them again.) The peel and stick tiles are cheap, but they are really cheaply made.

During the first 3 months, we had the appliances delivered. Fridge, stove, dishwasher, cabinet mount microwave, and stackable washer and dryer. So all of this stuff is just sitting in the middle of the floor while we are working. It was like a maze trying to navigate the kitchen. Thank goodness the kitchen is very large.